Primavera P6 Professional Advanced R 8.2

This course provides in‐depth resource management and project management training in Primavera P6 Professional. Resource management topics include manual allocation, bucket planning, and leveling. Project management topics include earned value analysis, advanced scheduling, and time scaled logic diagrams.

Learn To:

  • Use bucket planning
  • Use resource leveling
  • Use earned value analysis
  • Calculate percent complete
  • Calculate multiple float paths
  • Analyze resource usage

Course level: Advanced

Target role: Program Managers, Project Managers, Project Coordinators & Planners/Schedulers, Business Analysts, End Users, Functional Implementer

Additional audiences: Existing project management module users, Existing P3e/c, Enterprise, and Team Play users.

Professional Development and Continuing Education Units: Earns 13PDUs and 1.3 CEUs

Required Prerequisite: Primavera P6 Professional Fundamentals Rel 8.2

Course Length: 13 hrs

Course Objectives:

  • Analyze resources and roles
  • Use the Assignments window
  • Assign cost accounts
  • Analyze resources
  • Bucket planning
  • Level resources
  • Use earned value
  • Calculate percent complete
  • Use advanced scheduling techniques
  • Use timescale logic diagrams

Course Topics:

Using Earned Value Analysis

  • Calculating Planned Value Cost
  • Calculating Actual Cost
  • Calculating Earned Value Cost
  • Measuring Performance Percent Complete

Managing Multiple Projects

  • Opening Multiple Projects
  • Setting the Default Project

Analyzing Resources and Roles

  • Using the Resource Usage Profile
  • Using the Resource Usage Spreadsheet

Manually Allocating Resources

  • Viewing the Assignments Window
  • Viewing and Editing Allocation

Using Bucket Planning

  • Editing Future Buckets
  • Using Curves

Leveling Resources

  • Setting Leveling Options
  • Leveling Based on Priority

Advanced Scheduling

  • Multiple Float Paths
  • Calendar Effect on Lag
  • Scheduling Out‐of‐Sequence Activities

Timescale Logic Diagrams

  • Choosing a Template